search
Project Proposal

Project Proposal

Home>Project Proposal>Poultry/broiler abattoir project proposal

300Poultry per hour slaughterhouse project

1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9

Description

Layout

Download

Poultry Abattoir Project Brief Introduce

1.1Poultry Abattoir Main Data

1).Poultry Abattoir Design Capacity:300-500Poultry/Hour

2).Poultry Abattoir Plant Out Size (LXWXH): 16000 X15000 X 4500 MM

3).Poultry Abattoir Plant Square Meter: 240M2

4).Bleeding Time: 3-4Minutes

5).Scalding Temperature: 60-650C

6).Scalding Time: 40-60Second

7).Chilling Temperature: 0~-20C

8).Chilling Time:30-60Minutes

9).Deliver Period In China:20Days

(The delivery as per buyer’s down-payment value have been received in China)

10).Installation and Debugging Technicians: 2Person

11).Installation and Debugging Period: 15Days

12).Installation and Debugging Technicians Salary: USD 100 (Shift/Person)

13).Voltage Rating: 380V / 3P / 50HZ

14).Electric Consumption: 18Kw/H

15).Water Consumption: 5Ton/Shift

16).Slaughterhouse Worker: 10-15Person

1.2Quality standard: the equipment are in compliance with the related ISO9001: 2008 standard

1.3Deliver Items: FOB

Loading port: Qingdao port of China

1.4Transportation way: Complete pig abattoir equipment need one set 40HQ container and one set 40GP containers for transportation by sea

1.5Packaging standard: original factory packaging loading in container

1.6Payment way: the total invoice value will be payment as two time, the detail as following:

The down-payment 40% of total invoice value will be payment within 10days from sale contract signature date through telegraphic transfer 

The rest 60% of total invoice value will be payment through telegraphic transfer before all equipment deliver from Qingdao port of China, meanwhile the seller party will invite buyer send one representative come to factory for equipment checking before loading into container for shipment 

1.7Quality guarantee: the quality guarantee period of all equipment are 12 months since the date when the installation and debug have been complete, the equipment are made available to buyer and signature is made on the buyer’s completed bill.

1.8Machinery maintaining: The seller will appoint one well skilled technician go to maintain the equipment for five workdays for buyer per each 6 month within Quality Guarantee Period, the buyer charge the accommodation and round-trip air tickets of technician, the salary of technicians charge free.

1.9Installation and debugging remark:

The total quotation have include equipment installation and debugging direction salary and not include international round-trip air tickets、accommodation and transport cost of technicians in buyer country

The installation & debugging time will be postponed caused by buyer which make equipment can’t installation in time, the buyer should payment salary to technicians $100 us dollar per technicians per shift for postponed time

image.png

Project proposal require

If you have any questions, feedback or comments, please fill out the form below and we will reply you back as soon as possible.
Copyright © 2024 Qingdao Empire Machinery Co., Ltd. | XML Sitemap | Powered by QINGHUADNS  بالعربية English