search
Project Proposal

Project Proposal

Home>Project Proposal>Poultry/broiler abattoir project proposal

100Poultry per hour slaughterhouse equipment project

1
2
3
4
5
6
7
1
2
3
4
5
6
7

Description

Layout

Download

Poultry Abattoir Project Brief Introduce

1.1Poultry abattoir main data

1).Poultry abattoir design capacity: 100Poultry/Hour

2).Design religion: Islamic Halal

3).Deliver items: FOB

4).Loading port: Qingdao Port of China

5).Poultry abattoir plant out size (L*W*H): 20000 *12000 X*4500 MM

6).Poultry abattoir plant square meter: 240M2

7).Bleeding time: 3-4Minutes

8).Scalding temperature: 60-650C

9).Scalding time: 40-60Second

10).Deliver period in China: 20Days

(The delivery as per buyer’s down-payment value have been received in China)

11).Installation and debugging technicians: 1Person

12).Installation and debugging period: 20Days

13).Installation and debugging technicians salary: USD 100 (Shift/Person)

14).Voltage rating:380V / 3P / 50HZ

15).Electric consumption-:40Kw/H

16).Water consumption:2Ton/Shift

17).Slaughterhouse worker:6-8Person

1.2Quality standard: the equipment are in compliance with the related ISO9001: 2008 standard

1.3Transportation way: Complete poultry movable abattoir equipment need one piece 20GP container and one piece 20GP container for transportation by sea

1.4Packaging standard: original factory packaging loading in container

1.5Payment way: the total invoice value will be payment as two time, the detail as following:

The down-payment 40% of total invoice value will be payment within 10days from sale contract signature date through telegraphic transfer 

The rest 60% of total invoice value will be payment through telegraphic transfer before all equipment deliver from Qingdao port of China, meanwhile the seller party will invite buyer send one representative come to factory for equipment checking before loading into container for shipment 

1.6Quality guarantee: the quality guarantee period of all equipment are 12 months since the date when the installation and debug have been complete, the equipment are made available to buyer and signature is made on the buyer’s completed bill.

1.7Machinery maintaining: The seller will appoint one well skilled technician go to maintain the equipment for five workdays for buyer per each 6 month within Quality Guarantee Period, the buyer charge the accommodation and round-trip air tickets of technician, the salary of technicians charge free.

1.8Installation and debugging remark:

The total quotation have include equipment installation and debugging direction salary and not include international round-trip air tickets、accommodation and transport cost of technicians in buyer country

The installation & debugging time will be postponed caused by buyer which make equipment can’t installation in time, the buyer should payment salary to technicians $100 us dollar per technicians per shift for postponed time

image.png

Project proposal require

If you have any questions, feedback or comments, please fill out the form below and we will reply you back as soon as possible.
Copyright © 2024 Qingdao Empire Machinery Co., Ltd. | XML Sitemap | Powered by QINGHUADNS  بالعربية English