search
Project Proposal

Project Proposal

Home>Project Proposal>Pig abattoir project proposal

Pig movable slaughterhouse project

1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9

Description

Layout

Download

The pig abattoir project proposal brief introduce

1.1 Pig abattoir project main data

1). Design Capacity :10-50Per shift

2). Pig Abattoir Plant Out Size (LXWXH):12000 X 2300 X 2700 MM

3). Deliver Period In China :20-30Days(The delivery as per buyers down-payment value have been received in China)

4). Installation and Debugging Technicians:1Person

5). Installation and Debugging Period:10Days

6). Voltage Rating:380V / 3P / 50HZ

7). Electric Consumption:20Kw/Hour

8). Water Consumption:3-5Ton/Shift

9). Slaughterhouse Worker:5-10Person/Shift

10). Pig Carcass Treatment Way:De-Hair Only

11). Scalding Temperature:58-620C

12). Scalding Time:3-4Minutes

1.2 Quality standard: the equipment are in compliance with the related ISO9001: 2008 standard

1.3 Design religion: Compliance international standard slaughtering tradition

1.4 Deliver Items: FOB

ü Loading port: Qingdao port of China

1.5 Transportation way: Complete pig abattoir equipment need one piece 40HQ containers for transportation by sea

1.6 Packaging standard: original factory packaging loading in container

1.7 Payment way: the total invoice value will be payment as two time, the detail as following:

ü The down-payment 40% of total invoice value will be payment within 10days from sale contract signature date through telegraphic transfer

ü The rest 60% of total invoice value will be payment through telegraphic transfer before all equipment deliver from Qingdao port of China, meanwhile the seller party will invite buyer send one representative come to factory for equipment checking before loading into container for shipment Quality Guarantee: The quality guarantee period of all equipment is 12 months since the date when the installation and debug have been complete, the equipment are made available to buyer and signature is made on the Buyers Completed Bill.

1.8 Quality guarantee: the quality guarantee period of all equipment are 12 months since the date when the installation and debug have been complete, the equipment are made available to buyer and signature is made on the buyers completed bill.

1.9 Machinery maintaining: The seller will appoint one well skilled technician go to maintain the equipment for five workdays for buyer per each 6 month within Quality Guarantee Period, the buyer charge the accommodation and round-trip air tickets of technician, the salary of technicians charge free.

1.10 Installation and debugging remark:

ü The total quotation have include equipment installation and debugging direction salary and not include international round-trip air ticketsaccommodation and transport cost of technicians in buyer country

ü The installation & debugging time will be postponed caused by buyer which make equipment cant installation in time, the buyer should payment salary to technicians $100 us dollar per technicians per shift for postponed time


image.png

Project proposal require

If you have any questions, feedback or comments, please fill out the form below and we will reply you back as soon as possible.
Copyright © 2024 Qingdao Empire Machinery Co., Ltd. | XML Sitemap | Powered by QINGHUADNS  بالعربية English